Details
-
Bug
-
Status: Closed (View Workflow)
-
Major
-
Resolution: Done
-
prod/bigpicture/jiracloud/2021/08/20/08/30, prod/bigpicture/jiraserver/2021/08/20/09/30/8.1.4
-
None
-
No
-
Agile
-
BigPicture
-
JIRA server, JIRA cloud
-
5
-
5
-
-
Sprint 2021/19
-
PI2021/5
-
3 hours, 4 minutes, 18 seconds -
3 days, 2 hours, 49 minutes, 31 seconds -
22 hours, 31 minutes, 6 seconds -
2 days, 21 hours, 28 minutes, 1 second -
3 hours, 2 minutes, 21 seconds -
19 hours, 16 minutes, 44 seconds -
1 week, 1 day, 2 hours, 34 seconds -
Description
Prerequisites:
Box with at least 2 sub-boxes.
Sprint with a long name (maximum characters)
Reproduction steps:
- Go to Scope definition of a box from prerequisites.
- Go to sub-scope synchronization, synchronize sub-scope by sprint field.
- Type name of sprint used in prerequisities.
Actual result:
Field is a bit longer than the one with shorter sprint name. Arrow down Is cut off. See screenshot.
Expected result:
Field is the same size, arrow down is not cut off. See screenshot.
Workaround:
N/A